Today is 2026-09-21 Monday,Welcome to this site 

Invite tenders

Announcement of Competitive Negotiation for T19 Window Swing Automation Production Line Project of Anqing Subsidiary

Word:[Big][Middle][Small] QR Code 2024/3/13     Viewed:    
Project Overview

Potential suppliers for the T19 window shaking automation production line procurement project should be on the website of Wuhu Mosentech Automotive Technology Co., Ltd( http://www.motiontec.cn/ )Obtain the procurement documents and submit them before 13:30 on March 21, 2024 (Beijing time).

1、 Basic information of the project
Project number: MT-HW2024030032.
Project Name: T19 Window Swing Automation Production Line.
Procurement method: Competitive negotiation
Budget amount: 1800000.
Maximum price limit: 1800000.

Procurement requirement: T19 automatic window shaking production line


Serial Number

Equipment name

Parameters and requirements

quantity

unit

1

Glass bracket, steel wire rope fixed pipe length oiling equipment

Please refer to the technical requirements and specifications for details

1

tower

2

Pulley riveting equipment

Please refer to the technical requirements and specifications for details

2

tower

3

Guide rail wire wheel cover flanging and riveting equipment

Please refer to the technical requirements and specifications for details

1

tower

4

Wire winding and screw locking equipment

Please refer to the technical requirements and specifications for details

2

tower

5

Final assembly equipment

Please refer to the technical requirements and specifications for details

2

tower

6

Guide rail oiling equipment

Please refer to the technical requirements and specifications for details

1

tower

7

Final inspection and testing equipment

Please refer to the technical requirements and specifications for details

2

tower

8

Silent room

Please refer to the technical requirements and specifications for details

1

tower

9

oil pump

Please refer to the technical requirements and specifications for details

1

tower

Parameter 1: Plan 11 pieces of equipment for the production line, including 1 silent room, 1 oil pump, and the required material turnover rack, tooling placement rack, material placement table, GP12 testing table, etc. Parameter 2: Production cycle time ≤ 23s/piece, single shift 7.5 hours (including tooling changeover time) to produce qualified products ≥ 1173 pieces (production cycle time includes personnel action cycle and equipment operation cycle), Parameter 3: Meet the S0R technical documents of this project.

Contract performance period: Two years

2、 Qualification requirements for applicants
1. Meet the provisions of Article 22 of the Government Procurement Law of the People's Republic of China;
2. Specific qualification requirements for this project:
Credit requirement: As of the deadline for submitting response documents, if the supplier has any of the following valid circumstances, their qualification review will not be approved
(1) Those who have been included in the list of dishonest persons subject to enforcement by the people's court
(2) Listed as a major tax illegal and dishonest entity by the tax authorities
(3) Listed by the finance department as a record of serious illegal and dishonest behavior in government procurement
(4) Those who have been included in the list of serious illegal and dishonest activities by the market supervision and management department

Note: "Effective" refers to being in a valid state to the extent and for the period specified in the "circumstances".

3、 Obtain procurement documents

Time: From March 14, 2024 to March 18, 2024, every day from 8:30 am to 12:30 am and from 1:30 pm to 5:30 pm (Beijing time, excluding statutory holidays).
Location: Wuhu Mosen Tech Automotive Technology Co., Ltd. website( http://www.motiontec.cn/ ).
Method: Anyone who intends to participate in the response, please send it via email within the designated time qizhongwang@motiontec.cn Retrieve SOR file.
Price: 0 yuan.

4、 Response file submission
Deadline: 13:30 on March 21, 2024 (Beijing time)
Location: [Bidding Room of Wuhu Mosen Tech Automotive Technology Co., Ltd.].

5、 Open it
Time: 13:30 on March 21, 2024 (Beijing time)
Location: [Bidding Room of Wuhu Mosen Tech Automotive Technology Co., Ltd.]

6、 Announcement deadline
3 working days from the date of this announcement

7、 Other supplementary matters
1. Source of Funds: □ Provincial Financial Funds □ Municipal Financial Funds □ County/District Financial Funds ■ Self raised Funds □ Other (Please specify the source and proportion of funds):
2. This project requires a bid security deposit of 2% of the maximum limit amount.
After the announcement of the bid opening, unsuccessful bidders shall return their bid security within 5 working days. The bid bond of the winning bidder shall be converted into a performance bond.
3. Technical consultation hotline for Mosentech Automotive Technology (Anqing) Co., Ltd.: [18855479138]
4. Other matters: [None]

8、 For any inquiries regarding this procurement, please contact us as follows.
1. Information of the purchaser
Name: Morintech Automotive Technology (Anqing) Co., Ltd
Address: Building 3, Automotive Parts Industrial Park, Yuanmeng New Area, Anqing Economic Development Zone, Anhui Province
Contact information: 17354237773
2. Project contact information
Project contact person: Zhao Cheng
Phone: 18855479138


Attachment 1: Response File - T19 Window Shaking Automation Production. doc

Attachment 2: Competitive Negotiation Document - T19 Window Shaking Automation Production Line. pdf

Go Back
Print
[Upward]